West Auckland | Roof Painting
A faded galvanised trough roof in bush-clad Titirangi, brought back to original Permanent Green Semi-Gloss with a heavy primer + 3-topcoat system. High-pitch sections completed on fall restraint and abseil rope.
A handsome bush-clad Titirangi home with a trough section galvanised metal roof in the original Permanent Green factory colour. The kind of architectural West Auckland property where the roof's lines are part of the design, bold trough profile, steep pitches, integrated parapet work. Decades of West Auckland weather had taken its toll.
The first hard part: surface preparation. The original Permanent Green coating had broken down significantly. Faded, chalking, surface contamination throughout. Most repaints fail not because of the paint but because of inadequate adhesion to the substrate underneath. To give the new coating system a fighting chance, we needed to strip the residual coating back as far as possibleanything left behind becomes a weak layer between the primer and the metal.
The second hard part: the pitch. Several sections of this Titirangi roof are at pitches you can't safely work on standing or walking. They need to be sprayed and rolled by a roofer suspended from the roofline with fall restraint and abseil rope. That's not standard roof-painter territory, most contractors quote those areas out or refuse the job entirely.
We brought the right rigging, the right safety gear, and a crew trained for it.


A four-stage process matched to the substrate and the access challenges:
Stage 1: Safety set-up. Fall restraint anchors installed at suitable structural points. Abseil rope rigging set up for the high-pitched sections. Site Safe-compliant working at heights from day one.
Stage 2: Heavy pressure clean. Not a light wash, a heavy high-pressure clean designed to strip as much residual chalked coating off the trough section profile as possible. The goal: bring the underlying galvanised substrate as close to a paint-ready surface as we could safely achieve. The prep at this stage is what determines whether the next coat sticks for 15 years or six months.
Stage 3: Heavy primer coat. One heavy coat of oil-based galvanised primer. Heavier than a standard primer pass, designed to fully soak into the trough profile, neutralise any residual surface oxidation, and create a robust bond layer for the topcoats. The right primer for galvanised steel; the wrong primer means failure within a year.
Stage 4: Three premium topcoats. Three coats of premium acrylic in the original Permanent Green Semi-Gloss colour, matched to the factory finish. The third topcoat (one more than a standard 2-coat job) adds film build for longevity on a high-exposure West Auckland roof.
The high-pitched architectural sections were completed on abseil rope, sprayed and rolled to the same finish quality as the accessible sections.


Total project: $9,000 to $12,000. The roof is back to its original Permanent Green Semi-Gloss factory look, with a 4-coat film build (heavy primer + 3 topcoats) calibrated for West Auckland's wet, windy conditions. A full reroof of a trough section roof at this scale and pitch would have been $45,000+, and disruptive.
Completed October 2023, now over two years into service. The 4-coat system continues to perform; the high-pitched sections show no signs of premature wear from sun or rain exposure. A solid real-world proof that proper prep and the right system on galvanised steel hold up in Auckland weather.
“Some roofs can't be sprayed standing on a ladder. The high-pitched architectural pieces in Titirangi need fall restraint, abseil rope work, and a crew trained for it. Doing it safely, and to the same finish quality as the easier sections, is what most contractors quote out”

An electrical fire took out the roof and trusses of a Wellsford home. Full insurance reroof completed in a week,…

Years of patched leaks finally put to bed with a full Colorsteel MC760 0.55-gauge reroof in Ironsand. Premium-spec metal, modern…

Failed Dek-Tite boot and missing back tray flashing replaced in a weekend, including a public-holiday install to beat the next…
Every roofing service Auckland homeowners need.
Premium coatings, colour consultation and 10-year warranties on every coating job.
Full restoration on concrete tile and Decramastic, the dominant roof types in Auckland.
$276 callout including diagnosis, photo report and minor repair on the day.
Long-run Colorsteel replacements, tile-to-metal conversions, asbestos removal.
Marley spouting, continuous Colorsteel, internal box gutter waterproofing.
MossGuard+ biocide system and 24-month maintenance plans.
Shieldcoat X Series CPM over existing Butynol, bitumen and torch-on flat roofs.
$495 specialist inspection + report for serious buyers and sellers.
Tell us your address and the roof type, we'll book a free inspection and send a written quote
This job was part of our roof painting work in West Auckland. See every case study on our roofing projects page.
Tell us your address and roof type. We will book a free inspection and send a written quote within 24 hours.
Get your free quote
We reply with a written quote within 24 hours.