A previous contractor had silicone-patched their way through a leaking multiunit roof. We rebuilt the penetrations properly, re-screwed the roof, and finished it in Shieldcoat Grey Friars Semi-Gloss. Three years on, still bone dry.
A substantial multiunit residential property in Greenlane, multiple units under a single connected long-run galvanised roof, parapet walls, multiple penetrations (chimneys, vents, satellite mounts). The kind of building where the roof is a shared asset across multiple tenants, and a leak affects multiple people at once.
The roof was leaking. That alone would be a job. But the bigger problem was what had been done about it over the previous years.
Previous contractors had patched their way through repair after repair using silicone. Every leak became a tube of sealant smeared over the symptom, never a proper engineered fix at the source. Over time the roof had become a patchwork of silicone smears that looked terrible, didn't seal properly, and made the underlying issue worse by trapping moisture against the metal substrate.
On inspection we identified the real issues: loose roofing screws across multiple sheets, penetration flashings that had failed entirely, and missing back tray flashings behind several of the roof penetrations. Water had nowhere to go but down into the units below, and silicone was never going to fix that.
This needed a proper rebuild, not another patch.


A multiunit roof can't be band-aided. The scope was a full structural and surface-level rebuild before any paint touched the substrate:
Stage 1: Re-screw the roof. Every sheet checked, all loose roofing screws replaced, fixings tightened to spec. A sound mechanical foundation before anything else.
Stage 2: Back tray flashings + new Dek-Tites. Every roof penetration (chimneys, vents, satellite mounts) re-flashed properly. Back tray flashings installed behind each chimney/vent to channel water around the obstruction rather than letting it pool. New Dek-Tite rubber boots sized correctly for each penetration. This is the part the silicone was meant to do, except it was never going to.
Stage 3: The 3-coat metal-specific paint system:
Stage 4: Final inspection, photo documentation, written workmanship guarantee. The property owner (and their tenants) finally had a roof that actually worked.


Total project: $13,000 to $16,000. For context, a full multiunit reroof at this scale would have run $80,000+. A properly rebuilt-and-repainted roof delivers equivalent weather-tight outcome plus an architectural finish for under 20% of that cost.
Completed December 2022, now over three years into service. No leaks, no callbacks, no further silicone needed. The Grey Friars Semi-Gloss finish has held its colour and the substrate is sealed properly against the next decade of Auckland weather.
More importantly: the underlying engineering problem (failed penetration flashings) has been solved permanently rather than patched temporarily. That's what separates a real repaint from a cosmetic one on a multiunit property.
“Silicone is a sealant, not a solution. On a multiunit roof especially, every patched leak is just a hidden bill waiting to land. Fix the engineering, back trays, proper flashings, the right primer for the substrate, and the leaks stop for a decade, not six months.”

A faded Colorsteel roof chalked back to bare metal. Rust inhibitor primer + two coats of Shieldcoat premium acrylic in…

An old asbestos pressed metal tile roof carefully removed by specialists with third-party sign-off, then rebuilt from the timber out,…

Moisture issues and leaks traced to a failed repointing job using the wrong material. Full Shieldcoat 4-coat restoration in terracotta…
Every roofing service Auckland homeowners need.
Premium coatings, colour consultation and 10-year warranties on every coating job.
Full restoration on concrete tile and Decramastic, the dominant roof types in Auckland.
$276 callout including diagnosis, photo report and minor repair on the day.
Long-run Colorsteel replacements, tile-to-metal conversions, asbestos removal.
Marley spouting, continuous Colorsteel, internal box gutter waterproofing.
MossGuard+ biocide system and 24-month maintenance plans.
Shieldcoat X Series CPM over existing Butynol, bitumen and torch-on flat roofs.
$495 specialist inspection + report for serious buyers and sellers.
Tell us your address and the roof type, we'll book a free inspection and send a written quote
This job was part of our roof painting work in Central Auckland. See every case study on our roofing projects page.
Tell us your address and roof type. We will book a free inspection and send a written quote within 24 hours.
Get your free quote
We reply with a written quote within 24 hours.